The scope of work is to provide the detailed design drawings for the construction of new 69kV switchyard with 20/25 MVA transformers and all required equipment’s including isolators, Breakers, CT’s, PT’s, Links, Gantries etc. Major deliverables shall include;
• 69kV DC Transmission Line
• 69kV Switchyards
• 34.5kV & 13.8kV S/S
• U/G Cable Feeders