Ma’aden Well Field Transmission Line Project Including New 69kV Switchyards Located in Turaif, KSA

August 27, 2021

The scope of work is to provide the detailed design drawings for the construction of new 69kV switchyard with 20/25 MVA transformers and all required equipment’s including isolators, Breakers, CT’s, PT’s, Links, Gantries etc. Major deliverables shall include;
• 69kV DC Transmission Line
• 69kV Switchyards
• 34.5kV & 13.8kV S/S
• U/G Cable Feeders

Contact Details
Pakistan: DHA Phase-11, Lahore
Contact Details
Pakistan: DHA Phase-11, Lahore

Copyright by FIC Engineers. All rights reserved.

Copyright by FIC Engineers. All rights reserved.