The scope is to conduct load flow, short circuit and motor starting study of electrical network which mainly consists of new MCC (LPG transfer pumps, LPG compressors and instrument air package loads) interconnected to the existing electrical network at 380V existing MCC. Finally, relay coordination study has been performed to determine the settings of over current protective devices that minimize plant outages and interrupt faults as rapidly as possible. An important aspect is to verify the proper margin between protective devices in series to enable a back-up protection system. That is, upstream devices are on a standby basis to act expeditiously in case the immediate device near to the fault location fails to operate.