Replace HV motor control gear at Uthmaniyah/ Shedgum gas plant

March 1, 2021

The objective of this study is to verify and validate the Over current settings applied in the existing Electrical Power Systems at Substations for the safety of personnel and equipment at new 4.16kV motor control gears and associated upstream electrical distribution equipment at Uthmaniyah and Shedgum gas plants. Detailed scope of this relay co-ordination study is to update the Applied settings in to ETAP Model, Generate TCC curves, verify and validate the settings applied. The purpose of the Arc Flash study is to fix, verify, define, and validate the personnel safety requirements along with equipment protection requirements.