Power system study of Petro Rabigh refinery, on ETAP

February 18, 2021

This project concerns the provision to perform Arc flash study for the electrical distribution system of Phase-1 & Existing refinery substations (SS-30, SS-40 & WR-
597) in Petro Rabigh. Arc Flash study for Phase-1 Substations under Main Substation-40 at 34.5kV, 13.8kV, 4.16kV & 0.48kV (Switchgears, MCCs &
Panelboards) have been included in project scope.

Softzone

Contact Details
Pakistan: DHA Phase-11, Lahore
Contact Details
Pakistan: DHA Phase-11, Lahore

Copyright by FIC Engineers. All rights reserved.

Copyright by FIC Engineers. All rights reserved.